Park City Municipal
Municipal Trail Planning, Connectivity & Parcel Optimization
Maintained a long-term strategic partnership with the City’s Trails & Open Space Department to advance connectivity and integrate recreation infrastructure within evolving public land holdings.
Designed the Freemason Trail to provide a safer off-road alternative to Deer Valley Drive.
Led design and construction of the Lynx Trail, strengthening neighborhood connectivity between Park City Heights and Lost Prospector.
Designed the five-mile directional uphill route Mother Urban linking Old Town to the Mid Mountain Trail following acquisition of the Treasure Hill Conservation Easement.
Maximized the Clark Ranch parcel through development of three downhill, bike-only, eMTB-compatible flow trails—Sparky, Family Truckster, and Cousin Eddie.
WOW Trail & Bonanza to WOW Connector
Inter-County Backcountry Connectivity & Crest Trail Integration
Partnered with the Wasatch Trails Foundation on the development of the WOW Trail (Wasatch Over Wasatch), originally envisioned to connect Wasatch County to the Wasatch Crest Trail.
Designed and constructed the upper five-mile backcountry segment between 2014 and 2016, while Wasatch State Parks completed the lower five miles.
Delivered the organization’s first major backcountry trail project, overcoming significant terrain, access, and logistical challenges in remote high-alpine conditions.
Completed the five-mile Bonanza Loop Trail (BLT) to WOW Trail connection, finalizing a twelve-year effort to link Wasatch County, Summit County, and the Wasatch Crest Trail.
Bonanza Flat Conservation Area
High-Alpine Conservation & Recreation Integration
Participated in trail planning following the City’s 2017 acquisition of the 1,350-acre Bonanza Flat Conservation Area.
Collaborated closely with conservation leadership, including Utah Open Lands, to align recreation planning with long-term ecological protection goals.
Helped establish a framework demonstrating how sustainable trail systems and conservation priorities can coexist within protected terrain.
Led planning, design and construction of Bloods Lake Trail, Lake Lackawaxen, Io, the Bonanza Loop Trail and Bonanza to Wow Connector.
Supported integration of year-round recreation strategy, including winter trail use and grooming operations.
Advanced a conservation-forward design philosophy influencing high-alpine trail development in the region.
Private Development Projects
Master Planning & Community-Integrated Trail Systems
Led master trail planning and design for Skyridge Mountain Community, Park City Heights, and Pioche (Deer Valley) developments, resulting in 20+ miles of multi-use and user-optimized trails.
Collaborated closely with development leadership to position trail systems as high-value community amenities and long-term assets.
Produced comprehensive master plan maps and construction layouts; oversaw field implementation both in-house and through subcontractors.
Coordinated volunteer participation for final finish work and community engagement.
Developed maintenance schedules and executed annual contractual trail maintenance to ensure long-term durability and performance.
Park City Mtn & Deer Valley Resorts
Resort Trail Network Design & Strategic Connectivity
Led long-term collaboration with resort leadership to expand and strategically connect lift-access and backcountry trail systems, integrating directional flow, user optimization, and progression-based design.
Contributed to layout and design of Jenni’s Trail and initiated routing for Tommy’s Two Step, supporting lift-access connectivity, safe hiking alternatives, and skill-progression experiences.
Played a central role in development of major resort connectors including Scott’s Bypass, Three Candles, Blazing Saddle, Charlie’s 9K, Silver Spur, Dawn’s Trail, and the Mid Mountain Extension.
Advanced directional, bike-optimized trail design through projects such as Silver Queen, Cyn City, Change Reaction, and Seldom Seen, enhancing flow, safety, and rider experience within high-traffic destination terrain.
Round Valley Open Space
Trail System Transformation & Long-Term Development Strategy
Played a leadership role in the long-term transformation of 2,100-acre protected open space into a cohesive, sustainable trail system.
Directed restoration efforts including removal of legacy fencing and debris, rerouting of eroded trails, and ecological rehabilitation of previously impacted areas.
Led expansion of singletrack network, nearly tripling trail mileage while improving flow, durability, and user experience.
Launched winter grooming operations for year-round use.
Collaborated with conservation partners and municipal leadership to align recreation growth with long-term land stewardship objectives.
Designed and implemented adaptive-friendly trails in partnership with the National Ability Center.